Acrow Formwork at the Clarence Bridge in Kaikoura

Our Doka formwork was used onsite at the Clarence Bridge North…

Formwork Feature – Large Framax Panels

Our formwork team are excited to now have in stock our Doka formwork larger Framax panels.

Doka Formwork for Shearwall at the Convention Centre

Doka Framax formwork being used for a large shearwall at the…

Acrow Formwork at the Christchurch Convention Centre

Acrow Formwork are proud to be involved with the construction…

Achieving Great Results with Formwork at Wynyard Quarter

Acrow’s formwork team have supplied Doka Top50 timber beam formwork to form the circular control room at the new Wynyard Qtr pump station.